Quote:
Originally Posted by The SMG
I'm going to ask you to put your neck on the line here Rob. What do you think the Umbrella model / setup will look like post implementation of the AWD in the UK? 
|
There are still a number of variables - I suspect that some smaller operators will struggle with the complexity and increase in effort.
The 12 week point is not cast in stone and lobbying continues - worse case it will see an initial "original" 12 week umbrella (if it stayed @ 12) and then something different post that period via a modified umbrella. The Contractor might not notice much difference if rates are higher than comparable permie or could be potentially better off if rate is lower than comparator!
I think there will be a
potential increase in inside ir35
psc like structures for those contracts that are long enough to warrant the setup etc (and before Mal/PCG shouts I am talking about less than 3 months which are typical in current market).
On the positive side, we have a cunning plan so I am not doom filled (despite how this might come across) and we have a good track record of doing things the right way and are working very closely with BIS, APSco, SPA, CBI, REC and others.
The purpose of me challenging Jeffrey previously was to raise the profile a little more and suggest that we can't sit on our hands.
I know that Umbrella is not for all (Mal) and yet it provides a good structure for many people and also for people who simply don't want the hassle (in their risk / quality / hassle PERSONAL profile).
Upwards and onwards.
Rob